One of the first steps in our studio build is working out how to treat the floor of the office, which is directly above the studio. The floor is yellow tongue and clip down flooring on 90mm steel channel.
Read MoreUsing 10EaZy noise management system to log noise over 5 days so that we can develop a target transmission loss for the studio construction.
Read More